Glossary

Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group 21 June 2019

Elexon has received a new GSP registration application from the Transmission Company.  National Grid Electricity Transmission (NGET) is connecting a new GSP at Islington.

Status

Who will this impact?

Elexon has received a new GSP registration application from the Transmission Company.  National Grid Electricity Transmission (NGET) is connecting a new GSP at Islington, which will form a connection between the existing High Voltage 400kV substation at Highbury and the UK Power Networks Distribution System in the London region.  This new GSP will be known as Holloway/Islington (GSP_HOLL_1).

The Transmission Company propose that GSP HOLL_1 is allocated to the London (_C) GSP Group.

Responses

If you have any views on the allocation of the above GSP to the London GSP Group, please respond using the consultation response form, and send to [email protected] by 17:00 on 5 July 2019.

Your response should be titled Holloway/Islington GSP Registration.