Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group
Status
Who will this impact?
Section K1.8 of the Code states that the Panel may consider revising the GSPs comprised in a Group of GSPs (including the establishment of a Group of GSPs):
- Where a new GSP Point is commissioned or an existing GSP Point is decommissioned; or
- Where the Panel consider it appropriate to do so.
Scottish Power are constructing a new Grid Supply Point in East Glasgow, to be known as Dalmarnock GSP.
The Transmission Company propose that GSP DALM3 is allocated to the South Scotland (_N) GSP Group.