Consultation for Allocation of a New GSP to a GSP Group
Summary
As part of a 132kV Switchgear change at Littlebrook S/S, National Grid and the affected LDSO are taking the opportunity to regularise the connection arrangement whereby supplies to two LDSO Networks and Littlebrook Power Station Supplies are currently the subject of a difference metering scheme. (Metering Dispensation D:32). This involves the registration of 2 ‘new’ GSPs, and the de-registration of existing GSP_LITT_1 and Distribution System Connection Point II_DARTFORD_C.