Elexon’s response to ENTSO-E’s consultation on the design of TERRE and RR Harmonised Balancing Area

Summary

Responses to the consultation had to be in a set format loaded into a web interface on the ENTSO-E website.
This document was used to develop the Elexon response in the format required and represents the submission made. We did not answer all the consultation questions. Only the questions to which Elexon made a response are listed within the response document.