Elexon’s response to Ofgem’s consultation on Switching Programme Significant Code Review: Retail Energy Code v3.0

Summary

In our response, we provided some comments around the redlining of REC v3.0 and noted that some other parameters need to be confirmed before Elexon proceeds with the required redlining. More specifically, Elexon asked for clarification around CR-D059 ‘Changes to support Energy Company Data’ and made some comments with regards to the Energy Market Data Specification (EMDS) and around the governance arrangements for the Supplier Meter Registration Service (SMRS).

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

Previous Circulars

Training services

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or