Glossary
Elexon’s Response to the ENA’s consultation on the Open Networks Flexibility Services Workstream
Status
Who will this impact?
In our response we suggested that it would be sensible if Distribution System Operator (DSO) baselining methodologies were consistent with those introduced through BSC Modification P376, in order to avoid asset operators having to meet two different standards at the same time. We also noted that we would be happy to work with the Open Networks team to ensure consistency of these arrangements, and that we’d welcome DSO involvement in P376.