P332 Report Phase Consultation: Revisions to the Supplier Hub Principle

Status

Who will this impact?

This is the Report Phase Consultation for P332 ‘Revisions to the Supplier Hub Principle’.

This Modification seeks to address issues associated with customer preferred Supplier Agents. The proposed solution is a side letter between Elexon and Supplier Volume Allocation (SVA) Data Collectors (DCs) which will enable a Supplier who does not have a direct contract with the DC to enforce, as a last resort, the side letter as a proxy contract, to ensure that BSC obligations are met. The proposed solution will now apply to SVA DCs only as SVA Meter Operator governance will move from the BSC to the Retail Energy Code (REC) from 1 September 2021 as part of Retail Code Consolidation (RCC).