Code of Practice 2: The Metering of Circuits with a Rated Capacity not exceeding 100 MVA for Settlement Purposes

This Code of Practice defines the minimum requirements for the Metering Equipment
required for the measurement and recording of electricity transfers at Defined Metering Points
where the rated circuit capacity does not exceed 100MVA.

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

Previous Circulars

Training services

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or