Code of Practice 5: The Metering of Energy Transfers with Max Demand of up to (and including) 1MW for Settlement Purposes

This Code of Practice states the practices that shall be employed, and the facilities that shall be provided for the measurement and recording of the quantities required for Settlement purposes. This Code of Practice specifically applies to the Metering Equipment to be installed on each circuit where the Maximum Demand of the electricity being transferred does not exceed 1MW.