DCP0003

Clarification of Grid Supply Point (GSP) and GSP Group Aggregation Rules

DCP0003 was raised by Elexon on 2 March 2007. Elexon has identified that the Aggregation Rules used to calculate the GSP Metered Volume and GSP Group Take for some ‘shared’ GSPs could be better aligned with the requirements set out in the Balancing and Settlement Code. Although this issue currently has no materiality for Settlement accuracy, Elexon believes that the Aggregation Rules and BSCP75 ‘Registration of Meter Aggregation Rules For Volume Allocation Units’ should be amended to ensure consistency with the Code requirements and minimise any ambiguity in interpretation that may exist. The proposed changes would also address a potential issue in the calculation of Transmission Loss Factors, were one of the transmission losses Modification Proposals currently with the Authority to be approved.

Progression

DCP0003 was raised on 2 March 2007. DCP0003 was issued for Industry Impact Assessment as part of CPC00600. DCP0003 was closed and raised as CP1197

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.