Advanced Search

The Balancing and Settlement Code (BSC) Arrangements

v 8.0
Download

The Balancing and Settlement Code (BSC) Arrangements

Guidance Note

The Balancing and Settlement Code (BSC) Arrangements

This document provides a high level explanation of the New Electricity Trading Arrangements (NETA) that were introduced in England and Wales in March 2001 and extended to Scotland in April 2005. Further information on these arrangements is contained in the Balancing and Settlement Code (BSC) and supplementary BSC documentation which you can download from the BSC Website1.

The New Electricity Trading Arrangements

A principle of the design of the NETA is that electricity should be traded bilaterally between willing buyers and sellers at prices under terms agreed between the counter-parties. Trades are carried out primarily ‘Over the Counter’ (OTC) and on the Power Exchanges that have developed to support the arrangements.

However, the characteristics of electricity mean it is almost inevitable that quantities of energy generated and consumed will deviate from the quantities for which contracts have been struck in advance. Consequently, central arrangements are required to:

    • meter the quantities produced and consumed by each party;

    • compare these with the quantities covered by bilateral contracts; and

    • provide financial settlement for the differences (known as ‘imbalances’).

These functions are collectively referred to as ‘imbalance settlement’.

NETA also introduced an additional function, referred to as the ‘balancing mechanism’. National Grid as the Transmission Company has a licence obligation to manage the Transmission System and, may anticipate that more energy will be generated than consumed, or vice versa. Unchecked, this would result in system frequency falling or rising to an unacceptable degree. The balancing mechanism provides a way for National Grid to buy or sell additional energy close to real-time to maintain energy balance, and also to deal with other operational constraints of the Transmission System.

Specifically, the balancing mechanism allows BSC Parties (if they wish) to submit Offers to sell energy (by increasing generation or decreasing consumption) to the system and Bids to buy energy (by decreasing generation or increasing consumption) from the system, at prices that the BSC Party chooses. These Offers and Bids can be submitted in respect of each unit of generation or consumption (known as a BM Unit) belonging to each BSC Party. National Grid accepts Offers and Bids as necessary to balance the system, and seeks to do so at least cost by taking the lowest-priced Offers and accepting the highest-priced Bids, consistent with factors such as transmission system constraints and the BSC Parties ability to deliver within the timescales necessary. The ‘cash-out’ or Energy Imbalance prices are generally derived as the weighted average price of these accepted balancing mechanism Offers and Bids.

From November 2019, the Trans-European Replacement Reserve product enables Balancing Service Providers to submit bids (upwards or downwards) to its Transmission System Operator on an hourly basis to fulfil 15 minute delivery periods. These are processed by a central European platform. This allows customers and independent aggregators to participate in the TERRE balancing product (using embedded generation or demand side response to deliver Replacement Reserve, independently of their electricity Supplier).

The Balancing and Settlement Code

The balancing and settlement arrangements and their governance are enshrined in the BSC (collectively known as the BSC arrangements). The requirement to have the BSC in force is placed on National Grid through its Licence. It is a condition of a Generation and Supply Licence that licensees are bound by the BSC, and that they must become BSC Parties by signing the BSC Framework Agreement (which gives contractual force to the BSC). Other parties who are not licensees have the option to sign the BSC Framework Agreement, which provides them the right to notify energy contract volumes and register BM Units (if they are Interconnector Users or licence exempt). This exposes them to any charges and payments that result.

The BSC also defines the obligations on Elexon, the Balancing and Settlement Code Company (BSCCo), in providing or procuring the services necessary to operate the BSC arrangements efficiently, and establishes the BSC Panel and defines its various responsibilities. A set of subsidiary documents including Balancing and Settlement Code Procedures (BSCPs), Communications Requirements and the Data Catalogues are referenced by the BSC, and compliance with these is also a condition of the BSC.

Other parties are recognised by the BSC. The Transmission Company has many obligations under the BSC and is itself a Party to it. Also the roles of various Agents are described - these Agents are not Parties to the BSC but are appointed, either by Elexon or by BSC Parties, to fulfil certain functions. Agents to the BSC include the Settlement Administration Agent (SAA), Central Data Collection Agent (CDCA), Energy Contract Volume Aggregation Agent (ECVAA) and the Funds Administration Agent (FAA), and these functions are performed under contract to Elexon. Party Agents include the Energy Contract Volume Notification Agents (ECVNAs) and Meter Volume Reallocation Notification Agents (MVRNAs) that notify bilaterally contracted volumes on behalf of Parties. Other Party Agents, specific to those Parties that are Suppliers, are Half-Hourly and Non-Half-Hourly Data Collection, Data Aggregation and Meter Operator Agents. Together with Suppliers, these go to make up the 'Supplier Hubs', an important element of the arrangements for the metering of domestic and commercial customers, whereby consumption in each Half-Hourly Settlement Period can be determined either using a Half-Hourly meter or using a ‘demand profile’ which apportions Non-Half-Hourly metered consumptions to individual Settlement Periods. Finally, Distribution Companies are also bound by the BSC, essentially for the provision of certain metered data.

Changes to the Trading Arrangements

A significant aspect of the BSC arrangements is the ability for those arrangements to evolve as improvements and new requirements emerge. Accordingly, the BSC has mechanisms for the consideration, approval and incorporation of changes, known as Modifications Proposals.

Any BSC Party, Citizens Advice and Consumer Scotland and, in limited circumstances, the BSC Panel can submit Modification Proposals. The administration of the procedures for the consideration and development of these Proposals is one of the prime functions of the BSC Panel, which is made up of:

    • a Chair (appointed by the Authority, via Ofgem);

    • industry members (elected by Parties);

    • a Transmission Company member (appointed by National Grid);

    • consumer members (appointed by the relevant consumer body); and

    • independent members (appointed by the Chair).

The Modification Procedures culminate in a Modification Report to the Authority, via Ofgem, containing the BSC Panel's recommendation as to whether or not a Modification should be made. The final decision in each case typically rests with the Authority.

Further Information

You can find further explanation of the BSC arrangements in the following documents, all of which you can download from the BSC Website.

For more information please contact the Elexon Support4 enquiry service.

Intellectual Property Rights, Copyright and Disclaimer

The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make.

All other rights of the copyright owner not expressly dealt with above are reserved.

No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it.

1 https://www.elexon.co.uk/

2 https://bscdocs.elexon.co.uk/bsc

3 https://bscdocs.elexon.co.uk/simple-guides

4 https://support.elexon.co.uk/csm