P375/6
First Workgroup meeting for P375 ‘Metering behind the Boundary Point’ and P376 ‘Utilising a Baselining Methodology to set Physical Notifications’.
AGENDA
1.Welcome and Introduction
2.Overview of defect
3.Exploring the consequence of inaccurate FPNs in Settlement
- How FPNs impact Settlement
- How FPNs are used under the Grid Code
- Interactions and links between the Settlement and Grid Code
- for FPNs and any consequential changes to other Codes
4.Review of IWAs and ToRs
- P375 ToRs
- P376 ToRs
- Independence of Assets
- Effect on Transmission System
- Metering Standards
5.How do/can the two Modifications complement/conflict with each other? (both)
- Examples of sites that will use Baseline Methodology,
- operational metering at the asset or both
6.Assurance methods
- How to ensure integrity of any Baseline Methodologies
- Assurance techniques for operational Metering
7.Next steps
- How to run future Workgroups