Market Entry

(Showing items 1-8 of 8)

Show 10 | 20 | 50 | All

I currently use the Low Grade Service but want to order a High Grade service. How can I do this?

You need to send us a Communication Line Request form to start the process. We will request further technical information from you before we raise an order for the line.
Read More

Do I need to lodge collateral (credit cover) with Elexon?

Redirected to https://www.elexon.co.uk/settlement/credit/

Read More

Can more than one BSC Party use the same High Grade line?

Yes, it is possible for different parties to share the same physical connection. You must indicate if this is your intention when placing the order. The High Grade service is […]
Read More

Do I need to create my own Party ID or is one allocated to me?

You need to create your own BSC Party ID; this information is on the Accession Form and all the other BSCP forms you submit to us through the market entry […]
Read More

How do I trade across the Interconnectors?

Redirected to https://www.elexon.co.uk/about/roles/interconnector-user/

Read More

I only want to become an Energy Contract Volume Notification Agent (ECVNA) or Metered Volume Reallocation Notification Agent (MVRNA). Do I have to sign the BSC?

Redirected to https://www.elexon.co.uk/market-entry/

Read More

What are the costs associated with being a BSC Party?

Redirected to https://www.elexon.co.uk/about/bsc-costs-charges/

Read More

How long does the market entry process take?

This is dependent on your market role. It can take as little as 2 months for a Non-Physical Trader and up to a year for a Supplier. This will be […]
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.