Glossary

BSC Panel 324

Agenda

1. Apologies – Michael Gibbons

Part I: Non-Modification Business (Open Session) 

2. Application for a derogation under BSC Section K5.2.1 for the Isle of Man Interconnector – Katie Wilkinson

Part II: Modification and Change Business (Open Session)

3. Change Report and Progress of Modification Proposals –  Lawrence Jones 
4. 126-E ‘Allowing non-BSC Parties to apply for Metering Dispensations’-Stan Dikeocha
5. P435 ‘Enabling EMRS to undertake preparatory work for potential future settlement services’- Stan Dikeocha
6. P415 Cost Benefit Analysis Methodology and Assumptions – Ivar Macsween

Part III: Non-Modification Business (Open Session) 

8. Minutes of Previous Meetings & Actions arising – Fionnghuala Malone

Standing Reports

9. Chair’s Report – Verbal – Michael Gibbons
10 Elexon Report – 324/01 – Sara Vaughan
11. Distribution Report – Verbal – Fungai Madzivadondo
12. National Grid Report – Verbal – Jon Wisdom
13. Ofgem Report – Verbal – Colin Down

Tabled Items

14. Report from the ISG – 324/01B 
15. Report from the SVG – 324/01C 
16. Report from the PAB – 324/01D1 
17. Report from the TDC – 324/01E
18.  Trading Operations: BSC Operations Headline Report (Online only)
19. System Price Analysis Report – (Online only)

Decision Papers

20. Review of Specified Charges – Kathy Ferrari
21. Updates to Panel Committees ToR – Victoria Moxham

Part IV: Confidential Business (Closed Session) 

22. Any other business 

Next meeting

Thursday 14 April 2022

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.