P070
Formal title: CMRS Metering for inter-DNO Boundaries within a GSP Group
Current Status
Submission
Initial Written Assessment
Assessment Procedure
Report Phase
With Authority
Awaiting Implementation
Implemented
Summary
The metering arrangements at Distribution System Connection Point (DSCP) (i.e. the boundary between two distribution networks) within the same GSP Group should be considered and treated in an exactly similar manner to the metering arrangements at a DSCPco incident with the boundary of two GSP Groups except for the sending of data into settlements SAA.
Progression
The Authority rejected the Proposed Modification on 27 September 2002