P085

Formal title: A Phased Implementation Scheme for changes to TLF in Section T of the code

Current Status

Submission
Initial Written Assessment
Assessment Procedure
Report Phase
With Authority
Withdrawn

Summary

This Modification proposes seeks to implement a phasing scheme in the event that the Transmission Loss Factor (TLF) value, currently set to 0 in Section T of the BSC, is changed to another value via Modification to the Code.

Progression

This Modification Proposal was withdrawn on 12 June 2002.