Glossary
P087
Formal title: Removal of Market Risk Associated with Operation of a Generator Inter-Trip Scheme
Current Status
Submission
Initial Written Assessment
Assessment Procedure
Report Phase
With Authority
Rejected
Summary
This Modification proposes to remove problems associated with the current method of calculating compensation for a generation inter-trip scheme – namely the possibility of ‘windfall gains’ and the setting of extreme negative values of System Sell Price.
Progression
The Authority rejected both the Proposed and Alternative Modifications on 2 September 2003.