P203 – Introduction of a seasonal Zonal Transmission Losses scheme

Formal title: Introduction of a seasonal Zonal Transmission Losses scheme

Current Status

Submission
Initial Written Assessment
Assessment Procedure
Report Phase
With Authority
Awaiting Implementation
Implemented

Summary

This Modification is based on the seasonal alternative solution to P198 developed at the Modification group but without any phasing. Seasonal zonal Transmission Loss Factors (TLF) (the “applicable TLFs”) would be derived ex ante for application to generation and demand BMUs within a zone (the “applicable zone”) for each of the four BSC seasons. The proposed scheme would retain the current process for allocating transmission losses to generation and demand (45% of transmission losses to production accounts and 55% to consumption accounts).

Progression

On 17 July 2008, the Authority published an open letter (see below) stating it was no longer in a position to reach a decision on the following Modification Proposals: P198 – Introduction of a Zonal Transmission Losses scheme P200 – Introduction of a Zonal Transmission Losses scheme with Transitional Scheme P203 – Introduction of a seasonal Zonal Transmission Losses scheme P204 – Scaled Zonal Transmission Losses. These Modification Proposals are therefore closed.

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.