P282 – Allow MVRNs from Production to Consumption or Vice Versa

Formal title: Allow MVRNs from Production to Consumption or Vice Versa

Current Status

Submission
Initial Written Assessment
Assessment Procedure
Report Phase
With Authority
Rejected

Summary

P282 proposes to allow energy reallocated via a Metered Volume Reallocation Notification (MVRN) to be reallocated to either a Production or Consumption Energy Account regardless of the BM Unit’s P/C Status.

This would remove the current restriction that energy can only be reallocated from a Production BM Unit to a Production Energy Account, or a Consumption BM Unit to a Consumption Energy Account.

Progression

P282 was raised by Statkraft on 26 March 2012. The Panel agreed to issue it for a six-month Assessment Procedure by a Workgroup, during which P282 underwent an Industry Impact Assessment and the Workgroup’s Assessment Consultation. The Workgroup recommended that P282 should be approved, and its Assessment Report was presented to the Panel at its meeting on 11 October 2012.

The Panel initially recommended that P282 should be rejected, and issued P282 for its Report Phase Consultation. The Panel made its final recommendation that P282 should be rejected at its meeting on 13 December 2012. P282 was rejected by Ofgem on 23 January 2013.

Next Events

There are no further Workgroup meetings scheduled.