EL02113: VAT Domestic Reverse Charge for Wholesale Supplies of Gas and Electricity [110.1 Kb] Issue Date: 19 June 2014

This ELEXON Circular is to inform BSC Parties of forthcoming changes re VAT treatment for trading charges.

EL02112: Updated: BSC Central Services planned downtime: 24 June 2014 [112.9 Kb] Issue Date: 17 June 2014

As per Change Proposal Circular CPC00742 there will be a ‘planned BSC Agent downtime’ for the BSC Central Services on Tuesday 24 June 2014 between 00.57 and 09.15 (BST). The downtime is required to deploy the June 2014 Release.

Please note that ELEXON Circular EL02111 stated that the start time for the downtime period was 00.15 (BST) which is incorrect.

EL02111: BSC Central Services planned downtime: 24 June 2014 [112.3 Kb] Issue Date: 17 June 2014

As per Change Proposal Circular CPC00742 there will be a ‘planned BSC Agent downtime’ for the BSC Central Services on Tuesday 24 June 2014 between 00.15 and 09.15 (BST). The downtime is required to deploy the June 2014 Release.

EL02110: ELEXON Power Outage [112.0 Kb] Issue Date: 13 June 2014

A planned power outage will take place this weekend. Therefore, our IT systems will be unavailable from 18.00 (BST) on Friday 13 June and will be back online from 09.00 (BST) on Monday 16 June.   More information is contained within the Circular.

EL02109: Update: Error in Interim Information Settlement Run Data for 21 May 2014 [242.2 Kb] Issue Date: 4 June 2014

This ELEXON Circular notes that erroneous data entering the Interim Information (II) Settlement Run has been corrected in BSC Central Systems and will be published in the Settlement Final (SF) Run.

 

EL02108: Cancelled: Planned National Grid BSAD Outage Thursday 5 June 2014 [107.4 Kb] Issue Date: 4 June 2014

Further to Circular EL02107 we have been notified by National Grid that the planned outage affecting the flow of Balancing Services Adjustment Data (BSAD) to the BSC Central Services between 10:10 (BST) to 13:10 (BST) (indicative timings) on 5 June 2014 has been cancelled and all processes will continue as normal.

EL02107: Planned National Grid BSAD Outage Thursday 5 June 2014 [112.2 Kb] Issue Date: 2 June 2014

We have been notified by National Grid that there will be planned downtime on Thursday 5 June 2014 between 10:10 (BST) to 13:10 (BST) (approx.) which will affect submission of Balancing Services Adjustment Data (BSAD) to the BSC Central Services.

This planned downtime is related to the unplanned outage which occurred on Saturday 31 May 2014.

EL02106: Error in Interim Information Settlement Run Data for 21 May 2014 [114.6 Kb] Issue Date: 2 June 2014

This ELEXON Circular notes the continuation of last week’s issue with the Central Data Collection Agent (CDCA). We have identified that, although accurate data has been collected, an error in aggregation has resulted in erroneous data entering the Interim Information (II) Settlement Run.

EL02105: Consultation on the Settlement of dynamically switched Meters [151.8 Kb] Issue Date: 2 June 2014

This consultation is part of a Profiling and Settlement Review project to identify options for maintaining accurate Settlement for dynamically switched Meters during and after the smart metering roll-out.  We invite BSC Parties and other interested parties to respond by 27 June 2014. Further information is contained within the Circular.

EL02104: Panel Elections 2014 [162.7 Kb] Issue Date: 30 May 2014

This Circular provides information about participating in the 2014 Election process for BSC Panel members.