EL02941 : Default of BSC – Economy Energy Trading Limited

This document sets out the resolutions made by the BSC Panel in relation to Economy Energy Trading Limited (company number 07513319, BSC Party ID ‘PAL’) (“the Defaulting Party”) under Section H3.2.1 of the Balancing and Settlement Code (“BSC”).

Download

EL02939 : BSC Default – OneSelect Limited

This Circular sets out the resolutions made by the BSC Panel in relation to OneSelect Limited (Company number 09689085; BSC Party ID ‘CRNFLWR’; MPID ‘CFWR’) (“the Defaulting Party”) under Section H3.2.1 of the Balancing and Settlement Code (“BSC”).  Provision of a copy of this document to a BSC Party shall constitute notification to that BSC Party of the decisions of the Panel, and shall also constitute notification to that BSC Party of the Default pursuant to BSC H3.2.1(a).

Download

EL02935 : BSC Default – Addito Supply Limited

This Circular sets out the resolutions made by the BSC Panel in relation to Addito Supply Limited (BSC Party ID: OBERON, Company number: 08053202) (“the Defaulting Party”) under Section H3.2.1 of the Balancing and Settlement Code (“BSC”). 

Download

EL02929 : UPDATE – Issue Releasing Daily Reports from CRA

Further to Circular EL02923 and with the exception of the CRA-I014 Registration Report for 21 November 2018, we have been able to distribute all registration reports from the 22 November 2018 onwards. We are still investigating the cause of the failure to generate the CRA-I014 for 21 November 2018.

Download

EL02928 : BSC Default – Spark Energy Supply Ltd

This Circular sets out the resolutions made by the BSC Panel in relation to Spark Energy Supply Ltd (Company number 05857467; BSC Party ID ‘SPARKNRG’; MPID ‘SPRK’) (“the Defaulting Party”) under Section H3.2.1 of the Balancing and Settlement Code (“BSC”). Provision of a copy of this document to a BSC Party shall constitute notification to that BSC Party of the decisions of the Panel, and shall also constitute notification to that BSC Party of the Default pursuant to BSC H3.2.1(a).

Download

EL02927 : Further BSC Default – URE Energy Limited

This Circular sets out the resolutions made by the BSC Panel in relation to URE Energy Limited (Company number 10300613; BSC Party ID ‘FARADAY’) (“the Defaulting Party”) under Section H3.2.1 of the Balancing and Settlement Code (“BSC”). Provision of a copy of this document to a BSC Party shall constitute notification to that BSC Party of the decisions of the Panel, and shall also constitute notification to that BSC Party of the Default pursuant to BSC H3.2.1(a).

Download

EL02924 : BSC Default – URE Energy Limited

This Circular sets out the resolutions made by the BSC Panel in relation to URE Energy Limited (Company number 10300613; BSC Party ID ‘FARADAY’) (“the Defaulting Party”) under Section H3.2.1 of the Balancing and Settlement Code (“BSC”).  Provision of a copy of this document to a BSC Party shall constitute notification to that BSC Party of the decisions of the Panel, and shall also constitute notification to that BSC Party of the Default pursuant to BSC H3.2.1(a).

Download

EL02921 : BSC Default – Extra Energy Supply Limited

This Circular sets out the resolutions made by the BSC Panel in relation to Extra Energy Supply Limited (Company number 08053154; BSC Party ID ‘CALLISTO’) (‘the Defaulting Party’) under Section H3.1.1(c)(iii) of the Balancing and Settlement Code (‘BSC’). 

Download

EL02918 : Planned downtime required for infrastructure upgrade 21 and 22 November 2018

There will be two periods of planned downtime impacting the Balancing Mechanism Reporting Service (BMRS) overnight on 21 November 2018; firstly from 17:15 (GMT) to 22:15 (GMT) on Wednesday 21 November 2018 and subsequently from 03:15 (GMT) to 08:15 (GMT) on Thursday 22 November 2018.

Both periods of planned downtime are required for National Grid and ELEXON to carry out the communications line infrastructure upgrade.

Download

EL02915 : Remedied BSC Default – URE Energy Limited

Following a reduction in its Credit Cover Percentage to remedy a Level 2 Credit Default, URE Energy Limited (company number 10300613, BSC Party ID ‘FARADAY’) is no longer in Default of the BSC.

The resolutions made by the BSC Panel in relation to that Party on 8 November 2018 as published in ELEXON Circular EL02910 are no longer in place.

Download

EL02910 : BSC Default – URE Energy Limited

This Circular sets out the resolutions made by the BSC Panel in relation to URE Energy Limited (company number 10300613, BSC Party ID ‘FARADAY’) (‘the Defaulting Party’) under Section H3.2.1 of the Balancing and Settlement Code (‘BSC’).  

Download

EL02909 : BSC Default – Emexconsult Ltd

This document sets out the resolutions made by the BSC Panel in relation to Emexconsult Ltd (BSC Party ID: EMEX, Company number: NI614354) (‘the Defaulting Party’) under Section H3.2.1 of the Balancing and Settlement Code (‘BSC’). 

Download

EL02904 : Withdrawal from the Balancing and Settlement Code – Iberdrola Generación S.A.U (Party ID: IBERGEN, Agent Id: IBERAGEN)

Iberdrola Generación S.A.U will withdraw from the Balancing and Settlement Code (BSC) on 2 November 2018 in accordance with section A5.1 of the Code. Iberdrola Generación S.A.U (Party Id: IBERGEN Party, Agent Id: IBERAGEN) was previously registered as an Interconnector User and ECVNA. Its withdrawal should not affect any other Parties.

Iberdrola Generación S.A.U (Party Id: IBERGEN) has not traded within the last 14 months and has satisfied the criteria as set out in Section A5.1.3 of the BSC to enable it to withdraw.

Download

EL02901 : Implementation of Dynamic LoLP for P305 Stage 2

On 1 November 2018, Approved Modification P305 ‘Electricity Balancing Significant Code Review Developments’  Stage 2 will be implemented. Because National Grid send ELEXON Loss of Load Probability (LoLP) data for up to 80 Settlement Periods in a single file, it is not possible to cut over from ‘static’ LoLP to ‘dynamic’ LoLP via a ‘big bang’ implementation at midnight on 1 November 2018. As a result, an alternative transitional approach is necessary.

Download

EL02898 : Consultation on changing the value of DMAT and CADL

We are holding a consultation on the value of the pricing parameters De Minimis Acceptance Threshold (DMAT) and Continuous Acceptance Duration Limit (CADL). These parameters are used to classify and remove actions as part of the Imbalance Price Calculation.

Download

My ELEXON

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

ELEXON insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or