List of homepage news articles

This page lists all of the news articles we have produced over the last year. Any news articles older than 1 year are removed from the website as they will have concluded their designated lifecycle. Please contact us if you are looking for specific information on any subjects we have covered.

(Showing items 36-40 of 357)

Show 5 | 10 | 20 | All
View What are Radio Teleswitch System meters and how many are there in Great Britain?

What are Radio Teleswitch System meters and how many are there in Great Britain?

This is the first in a series of articles on Radio Teleswitch System (RTS) meters.

Long before smart meters, an option for variable rate meters was the Radio Teleswitch System, which relied on a radio signal for timing information. Since April 2020 the costs for the RTS service have been recovered through the Balancing and Settlement Code (BSC) charging arrangements. They were previously borne by the Energy Networks Association (ENA). The cost for the RTS service is a direct pass through to BSC Parties, and it has increased from £1.5m in 2022/23 to £4.9m in our 2023/24 business plan.

Read More
View Join the P434 Implementation Working Group

Join the P434 Implementation Working Group

We’re looking for members to join our P434 Implementation Working Group, created to support Parties impacted by Modification P434 ‘Half Hourly Settlement for UMS Metering Systems’. 

Read More
View Issue 101: Consultation on the framework for the enduring DIP governance, funding and operation

Issue 101: Consultation on the framework for the enduring DIP governance, funding and operation

This consultation invites potential Data Integration Platform (DIP) users and other interested parties to provide their views on the proposed framework for the enduring governance, funding and operation of the Data Integration Platform (DIP).

View Credit Assessment Load Factor values for Autumn 2023: 1 August appeal deadline

Credit Assessment Load Factor values for Autumn 2023: 1 August appeal deadline

The Credit Assessment Load Factor (CALF) values for the Autumn 2023 BSC Season, which runs from 1 September 2023 to 30 November 2023, are available from the BSC Portal. If you are the Lead Party of a non-Credit Qualifying BMU, you can appeal an assigned CALF value if you believe it does not accurately represent your expected activity.

  • BSC Portal > Financial and Credit > Credit / Credit Alerting
Read More
View Consultation: decreasing CAP to £90 from 13 June 2023

Consultation: decreasing CAP to £90 from 13 June 2023

This page gives details of a consultation on decreasing the Credit Assessment Price (CAP) to £90 from 13 June 2023. This two-day consultation will close at 17:00 on 25 May 2023.

View Get involved with the Performance Assurance Working Group

Get involved with the Performance Assurance Working Group

Calling all industry members – we want your input as members of our Performance Assurance Working Group (PAWG). The PAWG is one of several working groups set up by Elexon to deliver the technical overview of the Market-wide Half Hourly Settlement (MHHS) scope.

Read More
View Submission of Generation and Demand Capacity for Summer 2023 BSC Season

Submission of Generation and Demand Capacity for Summer 2023 BSC Season

The Summer BSC Season begins on 1 June 2023 and if you are using the Elexon Kinnect Customer Solution, the deadline for submitting your Generation and Demand Capacity (GC/DC) values for the Season is 16 May 2023.

Read More
View Consultation: decreasing CAP to £100 from 26 May 2023

Consultation: decreasing CAP to £100 from 26 May 2023

This page gives details of a consultation on decreasing the Credit Assessment Price (CAP) to £100 from 26 May 2023. This two-day consultation will close at 17:00 on 11 May 2023.

View Supplier Volume Allocation Non-Final Demand Declarations

Supplier Volume Allocation Non-Final Demand Declarations

Elexon implemented Balancing and Settlement Code Modification P419 ‘Enhanced Reporting of Demand Data to the NETSO to facilitate BSUoS Reform’ in February 2023.

P419 introduced a process to allow Non-Final Demand Operators and Suppliers to declare Supplier Volume Allocation (SVA) Non-Final Demand Facilities through BSC processes so that they would be exempt from Balancing Services Use of System (BSUoS) Charges. 

  • Find out more about P419
Read More
View Deployment of Error Failure Resolution (EFR) against Settlement Risk 008

Deployment of Error Failure Resolution (EFR) against Settlement Risk 008

This is of interest to all Suppliers with Non Half Hourly portfolios

At its meeting on 27 April 2023, the Performance Assurance Board (PAB) approved the deployment of EFR for Settlement Risk 008; the risk that Supplier Volume Allocation (SVA) metered data is not processed or transferred correctly, or is not processed at all.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.