Glossary

June 2021: Standard Release

The approved Implementation Date for this Release is 24 June 2021. This page details the scope of the Release as well as the documents and BSC systems (collectively configurable items) that will be amended. Standard Releases occur three times per year and are usually scheduled for February, June and November.

You can find the approved amendments for each document for each change on the relevant change page. We also publish conformed versions of documents on the Changes Awaiting Implementation webpage, which include amendments to the documents for all approved changes (and not just this release).

Scope of the Release

The following changes are in scope:

Approved Changes

  • P398: ‘Increasing access to BSC Data’

  • CP1530: ‘Introduction of a formalised process for the validation of measurement transformer ratios by Elexon’

  • CP1539:  ‘Inclusion of LCCC as an Affected party in Metering Dispensation applications’
  • CP1540: ‘Strengthening the Qualification – Change of Ownership Process’

Impact on BSC Systems

There are no impacts to BSC Systems.

Configurable Items impacted by this Release

Certain documents (in accordance with the Baseline Statement) are approved when the change is approved. Others following approval of the change, are drafted and approved as part of the implementation phase. All documents on the Baseline Statement are issued for industry consultation or comment and approved by the BSC Panel or a Panel Sub-Committee.

Title New Version Document Status Document Approving Body Document Approval Date Mod/CP Change Status

Section B

28.0

Approved

Panel

10 December 2020

P398

Approved

Section H

31.0

Approved

Panel

10 December 2020

P398

Approved

Section V

44.0

Approved

Panel

10 December 2020

P398

Approved

Section X Annex X-1

97.0

Approved

Panel

10 December 2020

P398

Approved

BSCP514

37.0

Approved

SVG

1 December 2020

CP1530

Approved

BSCP515

17.0

Approved

SVG

1 December 2020

CP1530

Approved

BSCP32

12.0

Approved

Panel

8 April 2021

CP1539

Approved

BSCP537

14.0

Approved

ISG/SVG/PAB

4 May 2021

CP1540

Approved

Process for requesting BSC data

1.0

Pending

Panel

8 April 2021

P398

Approved

Document Impact Matrix 

You can see a complete list of BSC documents impacted by the June 2021 Release in the Document Impact Matrix.

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

Previous Circulars

Training videos and services

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or