Issue 99 will review the use of the D0215 ‘Provision of Site Technical Details’ and its associated processes, to identify the areas of improvement.
Next Events
The Issue 99 review concluded in January 2023. The Issue 99 report was tabled at the February BSC Panel meeting.
Summary
The D0215 data flow currently records some of the same information contained in the D0383 ‘Notification of Commissioning Information’ data flow such as current and voltage transformer (CT/VTs ratios) (J0454 and J0455) respectively, therefore duplicating information across both data flows.
The D0383 is populated following the Commissioning of Metering Equipment meaning the information in the D0383 has been validated as correct. However, the information in the D0215 is often unreliable, given it is requested prior to Commissioning. The Data Items within the D0215 that are not duplicated (Supply Capacity, Supply Voltage) may still be utilised and so the D0215 could be retained but edited to remove the duplication.
Progression
Issue 99 was raised by UK Power Networks on 2 March 2022.
A Request For Information (RFI) was issued on Monday 13 June 2022 with responses invited by 5pm on Friday 1 July 2022. This has been published on the Change Consultations page of our website.