Change Proposal: CP1502

Removal of the requirement to submit sampling data for Profile Classes 5-8 following the implementation of P272

Proposer: ELEXON

Current Phase: CPC Consultation

Lead Analyst: Edwin Foden

Category: SVA

Responsible Panel Committee: Supplier Volume Allocation Group (SVG)

Implementation Date: 28 June 2018 (June 2018 BSC Release)

Summary

Due to the implementation of Modification P272 ‘Mandatory Half Hourly Settlement Period for Profile Classes 5-8’, existing references to Profile Classes (PCs) 5-8 in BSCP510 ‘The Provision of Sampling Data to the Profile Administrator’ and the ‘Service Description for Profile Administration’ need to be removed.

Since April 2009, Meters in PCs 5-8 were upgraded to Advanced Meters capable of being read remotely and recording Half Hourly (HH) consumption. P272, implemented 1 April 2017, introduced a requirement for these classes to be settled using HH Metered Volumes (where the relevant Metering has been installed). HH measurements provide sufficiently regular and accurate data for profiling not to be required. For the few sites which were unable to upgrade to Advanced Meters, the regression equations have been ‘frozen’.

As the use of Profiling is no longer required to settle Meter consumption volumes in PCs 5-8, the provision of sampling data for these profiles is also not needed.

Progression

CP1502 was raised by ELEXON on 19 January 2018. CP1502 was presented to the SVG for information on 30 January 2018. It was issued for CP Consultation on 5 February 2018, with responses due by 2 March 2018.

Documents

CP1502 CP Consultation  [1.0 Mb]
Document Date: 5 February 2018

CP1502 - Proposal Form  [832.6 Kb]
Document Date: 19 January 2018