Glossary
A-Z Index
B
- Balancing & Settlement Code
- BM Units - Change of CVA Primary BM Unit Lead Party (CoPBLP) and Supplier ID Transfer Process
- BM Units - Registration of Balancing Mechanism (BM) Units
- BSC - Consolidated and Legal versions
- BSC explained
- BSC Insight articles
- BSC Panel
- BSC Procedures (BSCPs)
- BSC Sections
- BSC Signatories and Qualified Persons
- Business Definition Documents
C
- Calculating and Compensating for power transformer and cable (or line) losses - standard methods
- Central Management Systems
- Change Consultations
- Change identified by role
- Change Proposal Circulars
- Change Proposals
- Change Proposals (Draft Change Proposals)
- Change Release Circulars
- Change Releases
- Change Report and Change Register
- Change Team
- Charge Codes and Switch Regimes
- Code Administration Code of Practice (CACoP)
- Code Administration Code of Practice forum
- Committees & Groups
- Compliance testing and protocol approval of Settlement Meters and Outstations
- Consultations (Elexon responses to industry consultations)
- Consultations (Process, Operational and Credit consultations)
- Copyright, Disclaimer and Reservation of Rights
- Costs and Charges
- Credit Committee
- Credit Cover: lodging process
- Credit cover calculations
- Credit Cover explained
- Credit data from the Trading Operations Report
- Credit Default
- Customer Solution service
- CVA Qualification New Participants Guide
D
E
G
I
- Imbalance Settlement Group (ISG)
- Implementation Guidance for P272: Mandatory Half Hourly Settlement for Profile Classes 5-8
- Implementation Guidance for P350: Introduction of a seasonal Zonal Transmission Losses scheme
- Independent Distribution Network Operator (IDNO) – Entering the Market
- Industry Working Groups
- Insights Solution project
- Interconnectors
- Interface Definition Documents
- Issues
M
- Market-wide Half Hourly Settlement and the BSC
- Market-wide Half Hourly Settlement programme overview
- Market Domain Data (MDD) Circulars
- Market Domain Data FAQs
- Market Entry & Exit
- Market Exit
- Measured Central Management System Test Specification
- Meeting room hire at Euston Road, London
- Metering for Offshore Wind Farms
- MHHS Design Working Group (ceased)
- Modification and Issue Workgroups
- Modifications
N
P
S
- SEAE and GUEE reports (archive only)
- Service Descriptions
- Settlement Calculation Hierarchy Overview
- Settlement Solution project
- Simple Guides
- Site-search guidance
- Smart Metering, Smarter Markets and Smart Grids
- Smart Metering and Compliance with the BSC
- Smart Meter Technical Detail (MTD) Report - Guidance Note
- Smart Meter Technical Detail Report (archive only)
- Software Technical Advisory Group (STAG)
- Street Lighting Load Research Project
- Submitting Expenses
- Supplier Volume Allocation Group (SVG)
- System Prices Analysis Report