View Metering Dispensations D505 Consultation

Metering Dispensations D505 Consultation

This is a public industry consultation on Metering Dispensation D505. We seek views from BSC Parties expressing their views or providing any further evidence on any of the matters contained within the consultation on D505.

View Credit Assessment Price (CAP) consultation: 7 September 2020

Credit Assessment Price (CAP) consultation: 7 September 2020

We have issued a consultation paper on the value of Credit Assessment Price (CAP).  We invite Parties to indicate whether they agree with the proposal to increase the value of CAP to £56/MWh from last notified value of £46/MWh.

View Consultation on the Market Index Definition Statement Review 2020

Consultation on the Market Index Definition Statement Review 2020

Our yearly analysis suggests that there are no further changes to the MIDS required at this time, with the current Individual Liquidity Threshold (ILT), timeband weightings and product weightings remaining suitable.

View Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group – 4 September 2020

Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group – 4 September 2020

Scottish Hydro Electric Transmission plc (SHE-T) is connecting a new circuit to the Rothienorman 33kV substation, required as part of the East Coast 400 kV Reinforcement project. This new Systems Connection Point will be registered in Settlement as a new GSP, to be known as Rothienorman (ROTI3).

The National Electricity Transmission System Operator (NETSO) propose that GSP_ ROTI3 is allocated to the North Scotland (_P) GSP Group.

Responses

If you have any views on the allocation of the above GSP to the North Scotland GSP Group, please respond using the consultation response form, and send to [email protected] by 17:00 on 18 September 2020.

View P350 draft reference network mapping statement for Reference Year 2019-20

P350 draft reference network mapping statement for Reference Year 2019-20

We issued a consultation on the draft reference network mapping statement for Modification P350 ‘Introduction of a seasonal Zonal Transmission Losses scheme’ to each Party. The network mapping statement is used for determining Nodal power flows in the calculation of Transmission Loss Factors. 

Response

Please respond using the consultation response form and send your responses, entitled  ‘P350 Draft Reference Network Mapping Statement’, to [email protected]  by 17.00 on Monday 14 September 2020.