Consultations for all Process, Operational and Credit areas
This page lists all Consultations relating to BSC and code processes, Market Entry and Compliance, and Operations and Settlement. The consultations allow ELEXON to gather feedback from the industry about proposed changes so that any concerns are considered as part of our processes.
This list does not include Change Consultations.
Metering Dispensations D505 Consultation
This is a public industry consultation on Metering Dispensation D505. We seek views from BSC Parties expressing their views or providing any further evidence on any of the matters contained within the consultation on D505.
Credit Assessment Price (CAP) consultation: 7 September 2020
We have issued a consultation paper on the value of Credit Assessment Price (CAP). We invite Parties to indicate whether they agree with the proposal to increase the value of CAP to £56/MWh from last notified value of £46/MWh.
Consultation on the Market Index Definition Statement Review 2020
Our yearly analysis suggests that there are no further changes to the MIDS required at this time, with the current Individual Liquidity Threshold (ILT), timeband weightings and product weightings remaining suitable.
Consultation for Allocation of a New Grid Supply Point (GSP) to a GSP Group – 4 September 2020
Scottish Hydro Electric Transmission plc (SHE-T) is connecting a new circuit to the Rothienorman 33kV substation, required as part of the East Coast 400 kV Reinforcement project. This new Systems Connection Point will be registered in Settlement as a new GSP, to be known as Rothienorman (ROTI3).
The National Electricity Transmission System Operator (NETSO) propose that GSP_ ROTI3 is allocated to the North Scotland (_P) GSP Group.
Responses
If you have any views on the allocation of the above GSP to the North Scotland GSP Group, please respond using the consultation response form, and send to [email protected] by 17:00 on 18 September 2020.
P350 draft reference network mapping statement for Reference Year 2019-20
We issued a consultation on the draft reference network mapping statement for Modification P350 ‘Introduction of a seasonal Zonal Transmission Losses scheme’ to each Party. The network mapping statement is used for determining Nodal power flows in the calculation of Transmission Loss Factors.
Response
Please respond using the consultation response form and send your responses, entitled ‘P350 Draft Reference Network Mapping Statement’, to [email protected] by 17.00 on Monday 14 September 2020.