Glossary Term: SP04 Exclusion Period

A Supplier shall not be liable to a charge in accordance with paragraph 3.5.1 in respect of any failure to install Half Hourly Metering Equipment during the three months following the date on which any Metering Systems (identified as not being 100kW Metering Systems) to which that Metering Equipment relates first become 100kW Metering Systems (the “SP04 Exclusion Period”); has the meaning given to that term in paragraph 3.5.2 of Annex S-1;

Suggest content changes

Glossary A-Z

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.