ISG219

AGENDA

1. Apologies – Iain Nicoll 

Decision Papers

2. Modification P350: Methodology for Load Periods and Sample Settlement Periods – 219/01 – Andy Ferreira

Information Papers

3. CP1519 ‘Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations’ – 219/02 – Chris Wood

Tabled Items

4. BSC Operations Headline Report – Tabled
5. Change Report – Tabled
6. System Price Analysis Report (SPAR) – Tabled

Other Business

7. Panel Update
8. Actions
9. Minutes From Previous Meeting
10. Any other business

My ELEXON

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of ELEXON insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or