Issue 108 ‘Further Extension of RTS Cost Recovery Arrangements Under the BSC’
Formal title: Issue 108 'Further Extension of RTS Cost Recovery Arrangements Under the BSC'
The contract between Elexon and the Energy Networks Association (ENA) to pass the operational costs for the Radio Teleswitch Service (RTS) through the BSC as ‘BSC Costs’ is due to expire on 31 March 2024. The BSC pass-through operational costs are currently circa £5 million and there are circa 1 million RTS devices (Radio Teleswitches and Radio Telemeters) in use.