CP0772 – Enhance D0268 ‘Half Hourly Meter Technical Details’ within the Code Subsidiary Documents.

Formal title: Enhance D0268 ‘Half Hourly Meter Technical Details’ within the Code Subsidiary Documents.

Current Status

Submission
Assessment
CPC Consultation
Committee Decision
Awaiting Implementation
Implemented

Summary

Apply a number of improvements to the D0268 ‘Half Hourly Meter Technical Details’ dataflow within the Code Subsidiary Documents to reflect existing manual processes being operated in the half hourly market. The improvements relate to the following: 1. Identify whether the half hourly site is a ‘complex site’ and therefore an information sheet should be provided. 2. Enhance the valid types of communication methods that can be used (for both hand held and Local Area Network (LAN) communications). 3. Identify the date when a half hourly meter has been removed.

Progression

This CP was implemented

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.