CP0803 – Missing requirement on Suppliers to address long term or repeatedly failing instructions.

Formal title: Missing requirement on Suppliers to address long term or repeatedly failing instructions.

Current Status

Submission
Assessment
CPC Consultation
Committee Decision
Rejected

Summary

A process is required to cover the situation in which an instruction failure occurs between an SMRA and a Data Aggregator and, although the SMRA may be informed of the fact, it is not able to resolve the failure. In these situations, issues may be left outstanding for long periods of time and the SMRAs do not have any procedures in place to deal with them.
This CP has been raised from SIR R2673.

Progression

This CP was rejected

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.