BSC Changes impacting a Generator

Glossary

This page shows which Modifications and Change Proposals have been identified as impacting a Generator. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.

(Showing items 1-5 of 40)

Show 5 | 10 | 20 | All
Sort By Last Updated Date: ASC | DESC

CP1594 ‘Creating an Approval Process for New and Legacy Communication Types’

Older metering communication types are quickly becoming redundant and are being replaced by newer communication types. Elexon are proposing to create an approvals process to allow for the managed end dating of older technologies, such as Public Switched Telephone Network (PSTN), Circuit Switched Data (CSD) and subsequently 2G.

Read More

P462 ‘The removal of subsidies from Bid Prices in the Balancing Mechanism’

This Modification aims to reduce consumer cost potentially caused by the interaction between the BM and support mechanism arrangements. This shall be done by removing distortion of support mechanisms (such as Contracts for Difference (CfDs) and the Renewables Obligation (RO) schemes) to reduce actions being taken outside of consumer cost order when following the Bid stack merit order.

The proposed solution for consideration by an industry Workgroup is to modify the equation BSC Section T ‘Settlement and Trading Charges’ paragraph 3.11 to pay the lost support mechanism.

Read More

P455 On-Site Aggregation as a method to facilitate Third Party Access

This Modification seeks to establish a more cost effective and efficient method for delivering Third Party Access on private networks that include domestic and small business customers. It does so by enabling aggregated meter data from sub meters on private networks to be submitted into Settlement in lieu of data from Settlement meters installed at the Boundary Point.

Read More

P463 ‘Introduce a Standard Change Process’

To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.

Read More

P432 ‘Half Hourly Settlement for CT Advanced Metering Systems’

This Modification proposes to align the BSC definition of an Advanced Meter with that in the Standard License Conditions (SLC) and to set explicit Half Hourly (HH) Settlement obligations for Current Transformer (CT) Advanced Meters ahead of the migration to Market-wide Half-Hourly Settlement (MHHS). 

Read More