Change consultations

This page lists all Change Consultations which are opened when we need to obtain feedback from the industry on potential Modifications, Change Proposals and Issues. The page also includes Change consultations which have ceased to be active as they have reached their closed date.

(Showing items 206-210 of 221)

Show 5 | 10 | 20 | All

P264 Report Phase Consultation

Summary

This is an Assessment Phase consultation for Modification P264 ‘Two-thirds majority requirement for Panel recommendations on licence originated Modifications’

P269 Assessment Phase Consultation

Summary

This is the Assessment Phase consultation for P269 ‘Prevention of Base Trading Unit BMUs’ Account Status Flipping from Consumption to Production’.

P268 Assessment Phase Consultation

Summary

This is an Assessment Phase Consultation for P268 ‘Clarify the P/C status process for exempt BM Units’.

P270 Report Phase Consultation

Summary

This is a Report Phase consultation for P270 ‘The Application of Line Loss Factors to GSPs that are not Transmission-interconnected’.

P269 Report Phase Consultation

Summary

Modification P269 ‘Prevention of Base Trading Unit BMUs’ Account Status Flipping from Consumption to Production (the “Flipping” mod)’ is issued for Report Phase Consultation.

My ELEXON

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of ELEXON insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or