Consultation for Removal of Grid Supply Point GSP FERRB1 from the North Eastern GSP Group (_F)
This page gives details of the consultation to remove a Grid Supply Point (GSP) and how you can respond.
Status
Who will this impact?
The National Grid Electricity Transmission System Operator (NETSO) is de-registering GSP FERRB1 (_F). The NETSO propose that no changes to the allocation of GSPs are required as a result of the deregistration of GSP FERRB1.
BSC Parties are invited to respond to this consultation using the proforma available below.
Please return responses to [email protected] by 17:00 on Monday 12 July 2021.