Check us out on:

Modification: P356

Aligning the BSC with Grid Code Modification GC0099 'Establishing a common approach to interconnector scheduling consistent with the single intraday market coupling processes set out within Regulation (EU) 2015/1222 (CACM)'

Proposer: National Grid

Current Phase: Assessment Procedure

Lead Analyst: Giulia Barranu

Category: Interconnector

Implementation Date: To be confirmed

Summary

P356 will align the BSC with Grid Code Modification GC0099, which seeks to introduce the interconnector scheduled transfer process to the Grid Code. This is in order to establish common, cross-code provisions which are compatible with both the EU single intraday market coupling processes, and GB and EU balancing processes.

Progression

P356 was raised by National Grid on 3 July 2017. The Initial Written Assessment was presented to the BSC Panel at its meeting on 13 July 2017.

The first P356-GC0099 joint Workgroup meeting will be held on Tuesday 25 July 2017 at the ELEXON offices. If you would like to join the P356 Workgroup or attend as a non-voting attendee, please email bsc.change@elexon.co.uk no later than 17 July 2017.

 

Documents

P356 Initial Written Assessment  [734.7 Kb]
Document Date: 17 July 2017

P356 Proposal Form  [440.0 Kb]
Document Date: 3 July 2017