P388 ‘Aligning the P344 and P354 Solutions’

Formal title: 'Aligning the P344 and P354 Solutions'

Current Status

Submission
Initial Written Assessment
Assessment Procedure
Report Phase
With Authority
Awaiting Implementation
Implemented

Summary

A number of opportunities to simplify and align the P344 ‘Project TERRE’ and P354 ‘Use of ABSVD for non-BM Balancing Services at the metered (MPAN) level’ legal text have been identified. The process for allocating MSID Pair Delivered Volumes to composite MSIDs will be be updated to account for both Virtual Lead Party and NETSO inputs. The P344 and P354 processes surrounding the Supplier Volume Allocation Metering System Balancing Services Register will be aligned and simplified.

Progression

The P388 Initial Written Assessment was presented to the BSC Panel on 11 July 2019.

P388 was raised by NETSO on 3 July 2019.

Next Events

The P388 Report Phase Consultation is issued 17 July 2019 to 30 July 2019.

The P388 Draft Modification Report will be present at BSC Panel 293 on 8 August 2019.

My ELEXON

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of ELEXON insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or