Glossary

Local Topic Carousel

(Showing items 411-420 of 423)

Show 10 | 20 | 50 | All
View Podcast: CP1527 ‘Increasing data storage capacity for Settlement Outstations’

Podcast: CP1527 ‘Increasing data storage capacity for Settlement Outstations’

Read More
View COVID-19: Estimation derogations to continue until further notice

COVID-19: Estimation derogations to continue until further notice

Supplier estimation derogations will continue until further notice. The derogations will be reviewed at April’s Performance Assurance Board (PAB) meeting, taking into consideration feedback from the industry.

Read More
View Holiday CALF values (Spring 2021 BSC Season) deadline: 15 February 2021

Holiday CALF values (Spring 2021 BSC Season) deadline: 15 February 2021

If you are a Lead Party of a non-Credit Qualifying Balancing Mechanism (BM) Unit you can appeal against an assigned Credit Assessment Load Factor (CALF) values and Holiday CALF values.

Read More
View Insights: The electricity industry – ten years of change

Insights: The electricity industry – ten years of change

The 2010s were a period of significant change for both Elexon and the wider industry. The shifts seen during the span of ten years were both unprecedented and unpredicted. Elexon provides a wealth of data to industry via the Balancing Mechanism Reporting Service (BMRS), Elexon Portal and through data flows. Using some of this data we have created four graphs that reflect on significant changes to generation, demand and balancing between 2010 and 2019.

Read More
View Changes to BSC Performance Standards for Meter Systems in Measurement Classes F and G

Changes to BSC Performance Standards for Meter Systems in Measurement Classes F and G

Performance Standards for Half Hourly (HH) Metering Systems in Measurement Classes (MC) F and G will increase from 90% of energy settling on actual data at the First Reconciliation Run (R1) to 99% on 1 January 2020.

Read More
View Wind generation output in December was the highest all year

Wind generation output in December was the highest all year

There is more evidence of the move to a lower carbon electricity system in our latest  BSC Operations Headline Report for December 2019 which showed that wind generation produced a monthly total of 5,613 gigawatt hours (GWh) for the GB Market. This was the largest monthly total for wind in 2019.

Read More
View Credit Assessment Price review outcome January 2020

Credit Assessment Price review outcome January 2020

Read More
View Join the Suppliers Charges Review Workshop

Join the Suppliers Charges Review Workshop

We are looking for volunteers to join the Supplier Charges Review Workshop on January 28 2020.  Attendees will discuss whether the Supplier Charges technique needs to be amended. 

Read More
View Insights: Low CO2 fuel sources powered 2019

Insights: Low CO2 fuel sources powered 2019

Nearly half of all the electricity generated in Great Britain in 2019 was generated by low CO2 generation. In this Elexon Insight, our Market Advisor Emma Tribe uses electricity generation data to show how 2019 was powered demonstrate how the electricity market is on the road to Net Zero.

Read More
View The future of open data at Elexon

The future of open data at Elexon

There is no doubt that data, combined with use of new technology, will play a huge part in helping to transform the energy markets. It opens up so many new possibilities for both consumers and energy companies.

Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.