Summary

The current designation process to allow non-BSC Parties to raise Modifications is described in BSC Section F ‘Modification Procedures’. Currently, Ofgem (‘the Authority’) can designate “such other bodies representative of interested third parties” to raise a Modification. This designation process was recently tested for the first time since the BSC was introduced and has been shown to be slow and opaque. It is also contrary to the direction of travel encouraged by Ofgem for Panels to become more Self-Governing.

P370 proposes to move the body responsible for designating non-BSC Parties to be able to raise Modification Proposals from Ofgem to the BSC Panel and for Ofgem to become the body to which designation appeals are made.

Progression

At its meeting on 12 July 2018, ELEXON recommended to the Panel to raise P370. The Panel agreed to raise the Modification Proposal in accordance with Section F2.1.1(d)(i) and agreed for the Modification to proceed directly to the Assessment Procedure.

The first Workgroup meeting was held on 3 August 2018. The second Workgroup meeting was held on 28 August 2018. The third meeting was postponed due to issues with quoracy and was held on 4 October 2018. At this meeting, the Workgroup agreed on a solution for Assessment Consultation, which will be issued at the end of October 2018.

Next Events

The Assessment Procedure Consultation will be issued week commencing 22 October 2018.

My ELEXON

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

ELEXON insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or