A stakeholder survey conducted by Elexon identified a number of key issues/possible areas for improvement in the BSC Change process. The Issue Group reviewed the BSC Change process to identify possible ways in which these key issues could be addressed or the BSC Change Process could be improved.
CP1584 ‘Allow non-BSC Parties to raise Change Proposals, add a CP withdrawal process and remove BCA/PACA concept’ was raised by Elexon on 1 August 2023 as a result of Issue 102.