BSC Changes impacting a SVA NHH Meter Operator Agent
This page shows which Modifications and Change Proposals have been identified as impacting a SVA NHH Meter Operator Agent. Please note that the assessment of where impacts may affect certain roles within the electricity market may be amended during the course of the Change process.
P463 ‘Introduce a Standard Change Process’
To introduce a new change process – a ‘Standard Change’ process – into the BSC arrangements that would allow for certain, low risk, predictable and repeatable pre-authorised changes to be implemented without following the existing Change Proposal or Modification procedures.
P456 ‘Enable Elexon to procure ancillary Technology Services for use by BSC Agents’
Removing barriers in BSC Section E that would prevent Elexon updating BSC Agent contracts, therefore enabling BSC Agents to use Technology Services procured by Elexon. This should reduce costs for BSC Parties.
P436 ‘Consequential BSC changes for Switching SCR (REC 3.0)’
Ofgem’s Switching Significant Code Review (SCR) will introduce the new Central Switching Service (CSS) and version 3.0 of the Retail Energy Code (REC 3.0). P436 progresses the consequential BSC changes needed to align with REC 3.0.
CP1532 ‘Reduce Half Hourly Change of Supplier timelines to meet the Initial Settlement Run’
CP1554 ‘Future proofing the measurement transformer standards’
CP1554 looks to future proof the measurement transformer standards in Code of Practices 1, 2, 3, 4, 5 and 10
CP1553: Meters and Current Transformers minimum accuracy classes
This Change proposal looks to tighten the requirements for Meters and Current Transformers in the Code of Practice.