List of all BSC Modifications

(Showing items 71-80 of 473)

Show 10 | 20 | 50 | 100 | All

P403: BSC Arrangements in the event that the TERRE Market is suspended by National Grid ESO

Read More

P402 ‘Enabling reform of residual network charging as directed by the Targeted Charging Review’

Following the conclusion of its Targeted Charging Review Significant Code Review , Ofgem directed National Grid and certain LDSOs to make changes to how residual revenues are recovered through Distribution Use of System (DUoS) and Transmission Network Use of System (TNUoS) demand charges.

Read More

P401: Governance arrangements for BSC Panel Alternates

To clarify the governance arrangements for BSC Panel Alternates in respect of their contribution to quoracy and voting at BSC Panel meetings. This will help to address ambiguity within the existing arrangements.

Read More

P400: BSC Panel Modification Business via Video/Teleconference

BSC Panel Modification Business via Video/Teleconference
Read More

P399 – BSAD Identity Visibility

P399 seeks to include additional information in the Balancing Services Adjustment Data (BSAD) to identify the assets involved in bilateral trades.

Read More

P398 ‘Increasing access to BSC Data’

P398 seeks to increase accessibility to data held by Elexon and BSC Agents. It will better align the BSC with the United Kingdom’s Industrial Strategy.

Read More

P397 Assessing the costs and benefits of adjusting Parties’ Imbalances following a demand disconnection

P397 seeks to introduce a mechanism through which the Balancing and Settlement Code Company (BSCCo) determines whether certain Parties should carry out the Settlement Adjustment Processes following a DCE.

Read More

P396 ‘Revised treatment of BSC Charges for Lead Parties of Interconnector BM Units’

Revised treatment of BSC Charges for Lead Parties of Interconnector BM Units
Read More

P395 ‘Aligning BSC Reporting with EMR Regulations – an enduring solution’

P395 seeks to introduce new and amended processes so that the BM Unit Gross Demand Report to the EMR Settlement limited (EMRS) only includes electricity ‘supplied’ to premises by Suppliers. 

Read More

P394 ‘Removal of Unused BSC Provisions’

Removal of Unused BSC Provisions
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.