Glossary

Metering Dispensations: News

View Consultation on Metering Dispensation D/565 for non-compliant Metering Equipment

Consultation on Metering Dispensation D/565 for non-compliant Metering Equipment

Elexon Ltd (Elexon) has raised a generic Metering Dispensation (D/565) on behalf of SMS PLC (SMS). If the BSC Panel approves a generic Metering Dispensation, it allows non-compliant Metering Equipment (or Metering Equipment that has not been approved under BSCP601 – a requirement of CoPs 1, 2, 3, 5, 10 and 11) to be installed and registered in any Settlement Metering System, subject to any conditions the BSC Panel agrees.

View Metering Dispensation consultation on remaining Class 2 Meters and Class 0.5 CT

Metering Dispensation consultation on remaining Class 2 Meters and Class 0.5 CT

We are seeking views from BSC Parties on whether they support the proposed Metering Dispensation (D/544). This Metering Dispensation is giving the affected parties’ time to use up old existing stocks of Class 2 Meters and Class 0.5 CT’s.

View Changes to Outstation requirements introduced on 30 June 2022

Changes to Outstation requirements introduced on 30 June 2022

We are in the process of contacting Outstation manufacturers to confirm whether or not their Outstations currently comply with the new requirements. This is because the Issue numbers and versions of Codes of Practice 1, 2, 3, 5 and 10 are changing and will be implemented on 30 June 2022 via the June 2022 BSC Release.

Read More
View Metering Dispensation consultation on re-calibration of Meters registered to CoPs 3 and 5

Metering Dispensation consultation on re-calibration of Meters registered to CoPs 3 and 5

We are seeking views from BSC Parties on whether they support the proposed Metering Dispensation (D/536) raised as part of Issue 97 and relating to Meter shortage risk driven by global materials availability and supply chain challenges.


Outcome (11 January)

The ISG (Imbalance Settlement Group) and SVG (Supplier Volume Allocation Group) have approved Metering Dispensations D/535 and D/536.


View Metering Dispensation consultation enabling Meter installation to pre-CP1527 implementation CoPs for 18 months

Metering Dispensation consultation enabling Meter installation to pre-CP1527 implementation CoPs for 18 months

We are seeking views from BSC Parties on whether they support the proposed Metering Dispensation (D/535) given the current Meter shortage issues and the ongoing struggles with obtaining crucial components for the manufacture of new Meters.


Outcome (11 January)

The ISG (Imbalance Settlement Group) and SVG (Supplier Volume Allocation Group) have approved Metering Dispensations D/535 and D/536.


View Consultation for a generic Metering Dispensation based on D/534

Consultation for a generic Metering Dispensation based on D/534

Seagreen Wind Energy Limited (SWEL) has applied for a site specific Metering Dispensation for a solution to the issue of metering its Low Voltage Direct Current (LVDC) supplies on its Seagreen Offshore Wind Farm. SWEL would be happy for it to be generic, as long as this does not introduce any delay.

We are seeking views on whether D/534 could be made generic instead of site specific, and whether it could be adapted to be more generic by including the various solutions under D/461 and D/474 and these Metering Dispensations end dated.


Outcome (11 January)

The SVG and ISG approved D/534 as we recommended subject to the condition that the Direct Current (DC) metering solution is not used for measuring DC supplies to customers for billing purposes. We have updated the Statement of Generic Metering Dispensations to reflect their decisions. You can find more details about the consolidated solution to metering LVDC supplies on Offshore Wind Farms on the statement.


My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.