Change Consultations

List of Change Consultations 

(Showing items 66-70 of 318)

Show 5 | 10 | 20 | All
View P364 Report Phase Consultation

P364 Report Phase Consultation

P364 will clarify the requirements for configuring and registering Plant and Apparatus in Balancing Mechanism (BM) Units. Specifically where Parties seek to share responsibility for Imports and Export from the same Plant and Apparatus or via the same Boundary Point.

It will also clarify the circumstances and requirements for maintaining BM Unit registration details and seeking to re-register BM Units when the configuration of Plant and Apparatus change

The P363+4 combined Assessment Report was presented to the Panel on 14 MArch 2019. the Panel agreed to amalgamate P363 into P364 and allow P364 to move into the Report Phase. Following amalgamation of P363 and P364, only the P364 page will be updated. The P363 page will not be updated.

View P382 report Phase Consultation

P382 report Phase Consultation

The Balancing and Settlement Code (BSC) contains multiple references to European Union (EU) legislation and bodies. Additionally, it also contains text introduced as a result of implementing various EU legislation. Retaining these references and text following the United Kingdom’s (UK’s) withdrawal from the EU without a deal (‘no-deal Brexit’) will mean that the BSC is no longer technically accurate but will remain operable because of the European Union Withdrawal Act 2018.

View P372 Assessment Procedure Consultation

P372 Assessment Procedure Consultation

The requirement to raise a Modification to make additions or changes to the data reported via the Balancing Mechanism Reporting Service (BMRS), is contributing to extended timescales for implementing these updates.

P372 aims to simplify the governance arrangements and reduce the timescales for the publication of data on the Balancing Mechanism Reporting Service (BMRS). 

The BSC is constructed in a way that means the burden of governance can be reduced while maintaining appropriate oversight, by taking BMRS changes out of the Modification process and putting them under formal control of the Change Proposal (CP) process.

View P381 Report Phase Consultation

P381 Report Phase Consultation

P381 proposes to remove Section C3.9.1 of the BSC in respect of ‘quarterly reports’. Currently, the quarterly reports are not viewed by market participants, as the information is made readily available in a more timely and accessible manner elsewhere on the BSC Website. Therefore, the current quarterly reports process utilises Elexon resource that could be better used adding greater value for our customers.

 

View P380 Report Phase Consultation

P380 Report Phase Consultation

Modifying the P344 wording of BSC Section Q ‘Balancing Mechanism Activities’ to ensure National Grid ESO’s continued compliance with the Balancing and Settlement Code (BSC) and the Replacement Reserve Implementation Framework (RRIF).

View P363 and P364 Assessment Consultation

P363 and P364 Assessment Consultation

Following Elexon’s review of Metering Dispensation the decision was made to raise two separate Modifications, P363 ‘Simplifying the registration of new configurations of BM Units’ and P364 ‘Clarifying requirements for registering and maintaining BM Units’, to address the issues that were found. Separate Modifications were proposed to address the two different defects at hand. It was thought that by keeping the Modifications separate we avoid the possibility of them being dependent on each other when it comes to approval and/or rejection. 

The combined P363/4 Workgroup identified a single solution that will remedy both the P363 and P364 defects. The proposed solution for P363/4 has four elements:

  • Expand BSC Section K ‘Classification and registration of Metering Systems and BM units’ Section 3 criteria for those BM Unit configurations that are deemed to meet the conditions to be registered as a Standard BM Unit;
  • Lay down new criteria for what is considered to be a Standard BM Unit;
  • Change the BSC so that an application to register BM Units must either meet the configuration criteria (bullet one above) or align with the new list of registration criteria (bullet two above) to be considered as a Standard BM Unit; and
  • Removing the need to apply for a Non-Standard BM Unit where the configuration is Standard but there is more than one Party involved.
View P378 Modification Consultation

P378 Modification Consultation

We have issued Urgent Modification Proposal P378 ‘ Introduction of a CM Supplier Interim Charge’ for industry consultation, with responses invited by 5pm on Tuersday 29 January 2019.

P378 seeks to use the BSC to introduce a CM Supplier Interim Charge for Suppliers. This will act as a contingency fund to protect the industry, and customers, from a price shock in the event that the CM standstill is lifted and back payments are required to be made. The Modification solution is based on the recommendations of Issue 76.

View P370 Report Phase Consultation

P370 Report Phase Consultation

We have issued P370 ‘Allow the Panel to designate non-BSC Parties to raise Modifications’ for Report Phase Consultation,  interested parties were invited to respond by Friday 25 January 2019. P370 seeks to allow the BSC Panel, instead of Ofgem, to designate interested third parties to raise Modification Proposals and for Ofgem to become the appeals body. P370 also opens up the Issues process to non-BSC Parties. 

View P377 Amending Gate Closure references in Market Index Data

P377 Amending Gate Closure references in Market Index Data

BSC Section T 1.5.3(b)(iii) defines ‘short term’ in relation to Market Index Data as a time period in reference to Gate Closure. Following BSC Modification P342 implemented in November 2017, the deadline for contracts for delivery in a Settlement Period has moved from Gate Closure to the Submission Deadline. P342 did not change the Market Index Definition Statement (MIDS) to reflect this. The 2018 MIDS Review is proposing to amend references of Gate Closure to the Submission Deadline to include trades taken in the hour prior to a Settlement Period in Market Index Data which will impact Market Index Data Providers. This change to the MIDS will need BSC Panel approval in November and approval from the Authority.

View P370 Assessment Procedure Consultation

P370 Assessment Procedure Consultation

We have issued P370 ‘Allow the Panel to designate non-BSC Parties to raise Modifications’ for Assessment Procedure Consultation, which you are invited to respond to by Monday, 12 November 2018. P370 seeks to allow the BSC Panel, instead of Ofgem, to designate interested third parties to raise Modification Proposals and for Ofgem to become the appeals body. P370 also opens up the Issues process to non-BSC Parties.