Change Consultations
List of Change Consultations
P439 Authority Led SCR Modification Consultation
P439 makes changes to the Balancing and Settlement Code (BSC) to enable Elexon, in its capacity as the Market-wide Half Hourly Settlement (MHHS) Implementation Manager, to develop the Event Driven Architecture (EDA) based system for MHHS, which will be known as the Data Integration Platform (DIP).
P395 Report Phase Consultation
P395 proposes to amend BSC systems and processes so that the SAA-I042 ‘BM Unit Gross Demand Report’ only includes electricity ‘supplied’ to premises by licensed Suppliers, and therefore excludes electricity imported by Generators operated by a licensee for generation activities (i.e. those activities authorised by their generation licence to carry on).
P415 Cost Benefit Analysis Consultation
CEPA and Elexon have issued a Call for Evidence to gather stakeholder views on the potential benefits, costs and other impacts of implementing P415.
P432 Assessment Procedure Consultation
This Modification proposes to align the BSC definition of an Advanced Meter with that in the Standard License Conditions (SLC) and to set explicit Half Hourly (HH) Settlement obligations for Current Transformer (CT) Advanced Meters ahead of the migration to Market-wide Half-Hourly Settlement (MHHS).
P425 Assessment Procedure Consultation
This Modification aims to reduce the requirement from two or more Suppliers, to one or more Suppliers, to be involved in a Shared Supplier Volume Allocation (SVA) Metering Arrangement.
CP1559 Assessment Consultation
This Change Proposal will deliver improvements to the Complex Sites process.
CP1562 Assessment Consultation
CP1562 seeks to update the NETA Interface Definition Documents Part 1 and 2 that were approved under P375, to provide clarity to the relevant Parties that make use of the document.
CP1561 Assessment Consultation
CP1561 looks to update the Supplier Volume Allocation (SVA) Catalogue Volume 1 and 2 to include the approved data flows and data items from CP1546.
P395 Assessment Procedure Consultation
Amending the BM Unit Gross Demand Report to the EMRS to include electricity ‘supplied’ to premises by Suppliers, correctly excluding electricity imported by Generators or Battery Storage facilities operated by a licensee for generation activities, for use in calculating FCL in accordance with BEIS regulations.
P436 Report Phase Consultation
Ofgem’s Switching Significant Code Review (SCR) will introduce the new Central Switching Service (CSS) and version 3.0 of the Retail Energy Code (REC 3.0). P436 progresses the consequential BSC changes needed to align with REC 3.0.