Change
P268 Report Phase Consultation
This is the Report Phase consultation for Modification P268 ‘Clarify the P/C status process for exempt BM Units’
P269 Report Phase Consultation
Modification P269 ‘Prevention of Base Trading Unit BMUs’ Account Status Flipping from Consumption to Production (the “Flipping” mod)’ is issued for Report Phase Consultation.
P270 Report Phase Consultation
This is a Report Phase consultation for P270 ‘The Application of Line Loss Factors to GSPs that are not Transmission-interconnected’.
P268 Assessment Phase Consultation
This is an Assessment Phase Consultation for P268 ‘Clarify the P/C status process for exempt BM Units’.
P269 Assessment Phase Consultation
This is the Assessment Phase consultation for P269 ‘Prevention of Base Trading Unit BMUs’ Account Status Flipping from Consumption to Production’.
P264 Report Phase Consultation
This is an Assessment Phase consultation for Modification P264 ‘Two-thirds majority requirement for Panel recommendations on licence originated Modifications’
P270 Assessment Phase Consultation
This is an Assessment Phase consultation for Modification P270 ‘The Application of Line Loss Factors to GSPs that are not Transmission-interconnected’
P264 Assessment Phase Consultation
This is an Assessment Phase consultation for P264 ‘Two-thirds majority requirement for Panel recommendations on licence originated Modifications’
P266 Report Phase Consultation
This consultation document seeks respondents’ views on the issues raised by P266: Improving the allocation of Reactive Power flows between Import and Export Metering Systems.
P266 Assessment Procedure Consultation
This consultation document seeks respondents’ views on the issues raised by P266: Improving the allocation of Reactive Power flows between Import and Export Metering Systems.