List of all BSC Change Proposals

These pages list all Change Proposals (CP) issued since 2010. These are detailed proposals which are raised to amend CSDs and/or BSC Systems, but would not alter the BSC. They must have a clear aim, a single defined solution and contain the relevant redlined documentation changes.

(Showing items 41-60 of 1047)

Show 10 | 20 | 50 | 100 | All

CP1524 ‘Improving the communication methods in the fault rectification process’

CP1524 seeks to implement changes to the communication process used by parties involved in rectifying faults on Half Hourly Metering Equipment.

Read More

CP1523 ‘D0312 Process Alignment’

BSCP501 Amendments to clarify the D0312 process
Read More

CP1522 ‘Updates to BSCP520 to align with working practices and UMSUG recommendations’

Updates to BSCP520 to align with working practices and UMSUG recommendations
Read More

CP1521 ‘BSCP70 Amendments for IA and IEA’

This Change Proposal seeks to amend BSCP70 to remove the statement excluding  Interconnector Administrator (IA) and Interconnector Error Administrator (IEA) roles from the requirement to undergo CVA Qualification Testing.

Read More

CP1520 Clarification to ‘Change of Ownership’ process in BSCP537

Clarification to 'Change of Ownership' process in BSCP537
Read More

CP1519 ‘Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations’

Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations
Read More

CP1518: Housekeeping change to address errors in the approved changes to BSCP514 for CP1515

Housekeeping change to address errors in the approved changes to BSCP514 for CP1515
Read More

CP1517: Changes to BSC Configurable Items for the TERRE Final Implementation Date

Changes to BSC Configurable Items for the TERRE Final Implementation Date
Read More

CP1516: New Interconnector Fuel Type Categories: ElecLink & IFA2

New Interconnector Fuel Type Categories: ElecLink & IFA2
Read More

CP1515: Faster Switching

Meter Operator Agents to send Metering System Data to SMRS instead of ECOES for the Faster Switching Programme
Read More

CP1514: Number of register digits for smart Meters

Number of register digits for smart Meters
Read More

CP1513: Inconsistencies in BSCP601, CoP3 and CoP5

Updates removing inconsistencies within and between BSCP601, CoP3 and CoP5
Read More

CP1512: Improving the format of BSCP11 forms

Improving the format of BSCP11 forms
Read More

CP1511: Configurable Items

Clarification of BSCP40 definitions and processes
Read More

CP1510: Allow the online management of registrations, Market Entry and Market Exit

Allow the online management of registrations, Market Entry and Market Exit
Read More

CP1509: Amend BSCP503 to add new recipients of the D0355 data flow

Amend BSCP503 to add new recipients of the D0355 data flow
Read More

CP1508: Updating standards in the CoPs and BSCP601

Updating references to the British and International Standards within the relevant Code Subsidiary Documents.
Read More

CP1507: Updates to BSCP520 to align with working practices

Updates to BSCP520 to align with working practices and UMSUG recommendations
Read More

CP1506: New Interconnector fuel type

New Interconnector fuel type
Read More

CP1505: Off site Commissioning of current transformers

Allowing ‘off site’ Commissioning of current transformers preinstalled in cut outs or switchgear at manufacture for use in low voltage (LV) installations
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

Previous Circulars

Training videos and services

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or