Change Proposals

These pages list all Change Proposals (CP) issued since 2010. These are detailed proposals which are raised to amend CSDs and/or BSC Systems, but would not alter the BSC. They must have a clear aim, a single defined solution and contain the relevant redlined documentation changes.

(Showing items 1-20 of 994)

Show 10 | 20 | 50 | 100 | All

CP1511

Clarification of BSCP40 definitions and processes
Read More

CP1510

Allow the online management of registrations, Market Entry and Market Exit
Read More

CP1509

Amend BSCP503 to add new recipients of the D0355 data flow
Read More

CP1508

Updating references to the British and International Standards within the relevant Code Subsidiary Documents.
Read More

CP1507

Updates to BSCP520 to align with working practices and UMSUG recommendations
Read More

CP1506

New Interconnector fuel type
Read More

CP1505

Allowing ‘off site’ Commissioning of current transformers preinstalled in cut outs or switchgear at manufacture for use in low voltage (LV) installations
Read More

CP1504

Amend BSCP201’s references to dual/single pricing following implementation of P305
Read More

CP1503

Changes to European Transparency Regulation data to align with latest ENTSO-e Manual of Procedures
Read More

CP1502

Removal of the requirement to submit sampling data for Profile Classes 5-8 following the implementation of P272
Read More

CP1501

Correction to P302 footnote in BSCP504
Read More

CP1500

Amend the BSCP537 Appendices to add a requirement for Suppliers and MOAs to demonstrate the ability to send and receive Smart Meter Configuration details
Read More

CP1499

Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Suppliers on Meter Operation Code of Practice Agreement Accreditation for Meter Operator Agents
Read More

CP1498

Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Meter Operator Agents on Meter Operation Code of Practice Agreement Accreditation
Read More

CP1497

Introduction of data flows for Half Hourly Meter Operator Agents to pass on Commissioning information when there is a Change of Agent
Read More

CP1496

Introduction of two data flows for the Commissioning process for Half Hourly (HH) Supplier Volume Allocation (SVA) Current Transformer (CT) operated Metering Systems
Read More

CP1495

Introduction of a rejection response dataflow for a D0170 ‘Request for Meter System Related Details’ request from the Meter Operator Agent to the Licensed Distribution System Operator where a D0215 ‘Provision of Site Technical Details’ response is required.
Read More

CP1494

Introduction of an objection window for Housekeeping Change Proposals
Read More

CP1493

Add a form and associated process steps to BSCP15 for registering Non-Standard BM Unit configurations
Read More

CP1492

Causes and treatment of large Line Loss Factors
Read More

My ELEXON

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

ELEXON insights

ELEXON Circulars

Training services delivered by ELEXON

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or