List of all BSC Change Proposals

(Showing items 201-250 of 1079)

Show 10 | 20 | 50 | 100 | All

CP1396 – Clarifications and Formalising scenarios for the BSCP509 Market Domain Data Changes Request Process

Clarifications and Formalising scenarios for the BSCP509 Market Domain Data Changes Request Process
Read More

CP1395 – Distribution of Configuration Details for Smart Meters

Distribution of Configuration Details for Smart Meters
Read More

CP1394 – Use of SMETS compliant Meters for Profiling

Use of SMETS compliant Meters for Profiling
Read More

CP1393 – Technical Assurance – CDC Check

Technical Assurance - CDC Check
Read More

CP1392 – BSCP18 Bid-Offer Acceptance Related Data Corrections to the SAA system via Electronic File Transfer method (BMRA-I002) instead of manual Email method (SAA-I033).

BSCP18 Bid-Offer Acceptance Related Data Corrections to the SAA system via Electronic File Transfer method (BMRA-I002) instead of manual Email method (SAA-I033).
Read More

CP1391 – Clarify the existing MDD registration criteria for new Suppliers within the MDD (BSCP509) and Qualification (BSCP537) procedures

Clarify the existing MDD registration criteria for new Suppliers within the MDD (BSCP509) and Qualification (BSCP537) procedures
Read More

CP1390 – New MDD Entity for SMETS Version

New MDD Entity for SMETS Version
Read More

CP1389 – Removal of Lux Meter Requirement for PECU Arrays

Removal of Lux Meter Requirement for PECU Arrays
Read More

CP1388 – Meter Technical Details for Smart Meters

Meter Technical Details for Smart Meters
Read More

CP1387 – Clarifications to BSCP533 and Appendices

Clarifications to BSCP533 and Appendices
Read More

CP1386 – Improving Settlement Accuracy for Unmetered Supply on a Change of Supplier or Change of Agent

Improving Settlement Accuracy for Unmetered Supply on a Change of Supplier or Change of Agent
Read More

CP1385 – Notification of NHH Energisation Status Change by LDSO

Notification of NHH Energisation Status Change by LDSO
Read More

CP1384 – Clarification on disconnection and associated processes

Clarification on disconnection and associated processes
Read More

CP1383 – Upgrade of NHHDA and EAC/AA systems to Oracle 11g

Upgrade of NHHDA and EAC/AA systems to Oracle 11g
Read More

CP1382 – Clarification of IDD rules for leading zeroes

Clarification of IDD rules for leading zeroes
Read More

CP1381 – Negative Wind Generation Forecast on BMRS

Negative Wind Generation Forecast on BMRS
Read More

CP1380 – Removing Agent Restrictions for Appointment of PRA Agent

Removing Agent Restrictions for Appointment of PRA Agent
Read More

CP1379 – Service Review of the Technical Assurance of Metering Systems

Service Review of the Technical Assurance of Metering Systems
Read More

CP1378 – Alternative to CP1377 – Clarifying rules on Third Party Access on Licence Exempt Distribution Network

Alternative to CP1377 - Clarifying rules on Third Party Access on Licence Exempt Distribution Network
Read More

CP1377 – Clarifying rules on Third Party Access on Licence Exempt Distribution Network

Clarifying rules on Third Party Access on Licence Exempt Distribution Network
Read More

CP1376 – Issues with Reporting Failed Instructions (D0023) Flows

Issues with Reporting Failed Instructions (D0023) Flows
Read More

CP1375 – Increasing Material Impact Threshold

Increasing Material Impact Threshold
Read More

CP1374 – Pre-site audit visits – Technical Assurance of Metering

Pre-site audit visits - Technical Assurance of Metering
Read More

CP1373 – Uploading multiple ECVNs/MVRNs via the EWS

Uploading multiple ECVNs/MVRNs via the EWS
Read More

CP1372 – Housekeeping Change to Demand BM Unit Example in BSCP75

Housekeeping Change to Demand BM Unit Example in BSCP75
Read More

CP1371 – Removing requirements for Line Loss Factor Audit to be performed at the LDSO offices

Removing requirements for Line Loss Factor Audit to be performed at the LDSO offices
Read More

CP1370 – Revised rules for default LLF values

Revised rules for default LLF values
Read More

CP1369 – Increased Flexibility in BSCP550 Data Splitting Algorithms

Increased Flexibility in BSCP550 Data Splitting Algorithms
Read More

CP1368 – Clarify/Resolve Operational Issues Related to Unmetered Supplies in SMRS

Clarify/Resolve Operational Issues Related to Unmetered Supplies in SMRS
Read More

CP1367 – Reporting Data relating to the East-West Interconnector on the BMRS

Reporting Data relating to the East-West Interconnector on the BMRS
Read More

CP1366 – Data Quality Obligations for Outgoing Supplier Agents

Data Quality Obligations for Outgoing Supplier Agents
Read More

CP1365 – Shortening Profile Production Timescales

Shortening Profile Production Timescales
Read More

CP1364 – Remove BSC Systems constraint on maximum negative CALF values

Remove BSC Systems constraint on maximum negative CALF values
Read More

CP1363 – Addressing Settlement Data Adjustments in a Balanced Manner

Addressing Settlement Data Adjustments in a Balanced Manner
Read More

CP1362 – Removal of Residual Negative EACs

Removal of Residual Negative EACs
Read More

CP1361 – Removal of Extreme EACs

Removal of Extreme EACs
Read More

CP1360 – Inclusion of Audit Records for Gross Volume Correction and Dummy Meter Exchanges

Inclusion of Audit Records for Gross Volume Correction and Dummy Meter Exchanges
Read More

CP1359 – Introducing new products into the Market Index Definition Statement

Introducing new products into the Market Index Definition Statement
Read More

CP1358 – Change to timeband weightings in the Market Index Definition Statement

Change to timeband weightings in the Market Index Definition Statement
Read More

CP1357 – Correction to MSID Allocation Process

Correction to MSID Allocation Process
Read More

CP1356 – Demand BM Unit Aggregation Rule Example for BSCP75

Demand BM Unit Aggregation Rule Example for BSCP75
Read More

CP1355 – Update to BSCP537 Qualification Appendix 2: Testing Requirements

Update to BSCP537 Qualification Appendix 2: Testing Requirements
Read More

CP1354 – Clarifying commissioning requirements of BSCP537 Qualification Appendix 1: Self Assessment Document (SAD)

Clarifying commissioning requirements of BSCP537 Qualification Appendix 1: Self Assessment Document (SAD)
Read More

CP1353 – Including the ECOES Meter Information flow (D0312) in BSCP514

Including the ECOES Meter Information flow (D0312) in BSCP514
Read More

CP1352 – Remove option of postal FAA invoices

Remove option of postal FAA invoices
Read More

CP1351 – Improving Half Hourly Metering Equipment commissioning and storage of associated commissioning data

Improving Half Hourly Metering Equipment commissioning and storage of associated commissioning data
Read More

CP1350 – Clarifying Meter Technical Details relating to Metering Systems that can be read remotely

Clarifying Meter Technical Details relating to Metering Systems that can be read remotely
Read More

CP1349 – Changes to accommodate EU metering standards

Changes to accommodate EU metering standards
Read More

CP1348 – Supplier Charges following implementation of CP1334 ‘New PARMS Serials’

Supplier Charges following implementation of CP1334 'New PARMS Serials'
Read More

CP1347 – Enhancements to SVAA Process for Distribution of Consumption Data for Embedded Networks

Enhancements to SVAA Process for Distribution of Consumption Data for Embedded Networks
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.