List of all BSC Change Proposals

These pages list all Change Proposals (CP) issued since 2010. These are detailed proposals which are raised to amend CSDs and/or BSC Systems, but would not alter the BSC. They must have a clear aim, a single defined solution and contain the relevant redlined documentation changes.

(Showing items 101-150 of 1047)

Show 10 | 20 | 50 | 100 | All

CP1464

Requiring HH consumption data to be processed to appropriate precision
Read More

CP1463

Process for Elexon to calculate category 1 non-compliance materiality
Read More

CP1462

Allow the CDCA to break and remake Metering Equipment seals to access local interrogation port
Read More

CP1461

Amending BSCP128 to reflect a new simple SVA file format for LDSO LLF submissions
Read More

CP1460

Timely inclusion of SBR Actions into imbalance cashout
Read More

CP1459

Amendments to the process for performing a Post-Final Settlement Run
Read More

CP1458

Introduction of timescales for the P283 Commissioning process for SVA CT operated Metering Systems
Read More

CP1457

Changes to BSCP520 to support the introduction of Generic LED Charge Codes
Read More

CP1456

Clarification to BSCP514 regarding the sending of Meter Technical Details on receipt of a D0170 data flow
Read More

CP1455

Sending revised Meter Technical Details following a change of Meter Operator Agent
Read More

CP1454

Amendment to the Category 1 Materiality Calculation
Read More

CP1453

Changes to SAA Service Description and SAA URS for P269 systems fix
Read More

CP1452

Aligning BSCP502 with amendments to the Electricity Supply Licence
Read More

CP1451

Allowing HH Default EACs for all HH Measurement Classes
Read More

CP1450

Security Requirements for CoP10 Metering Equipment
Read More

CP1449

Updates to BSCP520 and the SVA Data Catalogue following a review
Read More

CP1448

Changes to allowable software for Method 3 Proving Tests
Read More

CP1447

Amendment to the timescales for sending the D0010 from Supplier to NHHDC on a Smart Change of Supply event
Read More

CP1446

Allow smart CoS agreed Disputed Reads to be entered into Settlement
Read More

CP1445

BSCP516 alignment with revised P272 Implementation Date
Read More

CP1444

Extend the timescale of CoP10 Proving Tests until the implementation of P272
Read More

CP1443

Standard Settlement Configurations for smart and advanced Meters
Read More

CP1442

Clarifying the application process for Metering Dispensations
Read More

CP1441

Allowing the Peer Comparison technique to be reported on a Supplier Agent level
Read More

CP1440

Exempting Metering Systems in Measurement Class F from proving tests
Read More

CP1439

Proving Test Permissible Software
Read More

CP1438

Clarification of information required for raising a Trading Dispute
Read More

CP1437

Recommended amendments to BSCP68
Read More

CP1436

EAC/AA and NHHDA Applications – Windows Server upgrade
Read More

CP1435

Amendments to the SAA-I042 flow
Read More

CP1434

Amend the three digit numeric Line Loss Factor Class (LLFC) Id to an Alphanumeric LLFC Id
Read More

CP1433

Clarification of which Metering Systems are captured by the P272 requirements
Read More

CP1432

HH Default EAC by Measurement Class
Read More

CP1431

Extend Site Check Exemption to Measurement Classes F and G
Read More

CP1430

Clarification to the ECVN/MVRN processes
Read More

CP1429

Proving Test timescales
Read More

CP1428

Inclusion of Party Agents in the event of Post Final Settlement Runs
Read More

CP1427

Housekeeping change to BSCP503 for EMR
Read More

CP1426

Receipt of the D0296 flow at II
Read More

CP1425

Consequential changes to BSCP201 following EMR
Read More

CP1424

Amending the requirement for Data Aggregators to perform annual Full SMRS refreshes
Read More

CP1423

Amendments to BSCP68 following a review
Read More

CP1422

Add a Defined Metering Point for an Offshore Transmission Connection Point to the HH Codes of Practice
Read More

CP1421

Linking BSCP520 obligations to the Operational Information Document
Read More

CP1420

Allowance of mid-year LLF resubmissions due to material consumption or generation changes
Read More

CP1419

Improving data accuracy by enabling the D0312 flow to be sent on a Change of Supplier
Read More

CP1418

Validation of D0041 flows
Read More

CP1417

Reading validation for smart Meters
Read More

CP1416

Remotely disabled smart Meters
Read More

CP1415

Reading submission frequency for smart Meters
Read More

My BSC

Click on the X next to any of the icons to replace them with a short-cut link to the page you are currently on or search for a specific page.

List of BSC Insights

Previous Circulars

Training videos and services

Market Entry

Charge Codes and Switch Regimes

Add New

×

Or